ENVIRONMENT  
comments_image -

Even the Government's Nuclear Agency Thinks an Atomic Renaissance Is a Bad Idea

An unlikely source has dealt a devastating blow to the much-hyped revival of nuclear power: the Nuclear Regulatory Commission.
 
 
LIKE THIS ARTICLE ?
Join our mailing list:

Sign up to stay up to date on the latest Environment headlines via email.

 
 
 
 

A devastating blow to the much-hyped revival of atomic power has been delivered by an unlikely source -- the Nuclear Regulatory Commission. The NRC says the "standardized" designs on which the entire premise of returning nuclear power to center stage is based have massive holes in them, and may not be ready for approval for years to come.

Delivered by one of America's most notoriously docile agencies, the NRC's warning essentially says: that all cost estimates for new nuclear reactors -- and all licensing and construction schedules -- are completely up for grabs, and have no reliable basis in fact. Thus any comparisons between future atomic reactors and renewable technologies are moot at best. And any "hard number" basis for independent financing for future nukes may not be available for years to come, if ever.

These key points have been raised in searing testimony before state regulators by Jim Warren of the North Carolina Waste and Awareness Reduction Network and Tom Clements of the South Carolina Friends of the Earth, and by others now challenging proposed state-based financing for new Westinghouse AP-1000 reactors. The NRC gave conditional "certification" to this "standardized" design in 2004, allowing design work to continue. But as recently as June 27, the NRC has issued written warnings that hundreds of key design components remain without official approval. Indeed, Westinghouse has been forced to actually withdraw numerous key designs, throwing the entire permitting process into chaos.

The catastrophic outcome of similar problems has already become tangible. After two years under construction, the first "new generation" French reactor being built in Finland is already more than two years behind schedule, and more than $2.5 billion over budget. The scenario is reminiscent of the economic disaster that hit scores of "first generation" reactors, which came in massively over budget and, in many cases, decades behind promised completion dates.

In North and South Carolina, public interest groups are demanding the revocation of some $230 million in pre-construction costs already approved by state regulators for two proposed Duke Energy reactors. In both those states, as well as in Florida, Alabama and Georgia, Westinghouse AP-1000 reactors have been presented to regulatory commissions to be financed by ratepayers as they are being built.

This astounding pro-utility scheme forces electric consumers to pay billions of dollars for nuclear plants that may never operate, and whose costs are indeterminate. Sometimes called Construction Work in Progress, it lets utilities raise rates to pay for site clearing, project planning, and down payments on large equipment and heavy reactor components, such as pressure vessels, pumps and generators, that can involve hundreds of millions of dollars, even before the projects get final federal approval. The process in essence gives utilities an incentive to drive up construction costs as much as they can. It allows them to force ratepayers to cover legal fees incurred by the utilities to defend themselves against lawsuits by those very ratepayers. And the public is stuck with the bill for whatever is spent, even if the reactor never opens -- or if it melts down before it recoups its construction costs, as did Pennsylvania's Three Mile Island Unit Two in 1979, which self-destructed after just three months of operation.

According to Warren and Clements, Duke Energy and its cohorts have "filed some 6,500 pages of Westinghouse's technical design documents as the major component of applications" to build new reactors. "Of the 172 interconnected Westinghouse documents," say NCWARN and FOE, "only 21 have been certified." And most of what has been certified, they add, rely on systems that are unapproved, and that are key to the guts of the reactor, including such major components as the "reactor building, control room, cooling system, engineering designs, plant-wide alarm systems, piping and conduit."

submit to reddit

-
Email
Print
Share
LIKED THIS ARTICLE? JOIN OUR EMAIL LIST
Stay up to date with the latest Environment headlines via email
See more stories tagged with: nuclear industry, nuclear power, nuclear regulatory indust
Alternet Special Coverage - Occupy Wall Street
Advertisement
Most Read
Most Emailed
Most Discussed
On REDDIT
On DIGG
 
loading most read content ..
Advertisement
Disgusting: Racist Fox Commenters Spit Invective Over Whitney Houston's Passing

By Julianne Escobedo Shepherd | AlterNet

 
 
Naomi Klein and Joshua Holland Talk the Keystone Pipeline—Take Action Today

By Julianne Escobedo Shepherd | AlterNet

 
 
Dallas School Segregates Kids by Gender on Black History Month Field Trip

By PZ Myers | Pharyngula

 
 
Krugman: How Did Conservatism Turn Out This Bad?

By Julianne Escobedo Shepherd | AlterNet

 
 
Wall Street ‘Likely To Set Records’ For Political Spending Aimed At Defeating Obama In 2012

By Josh Israel | ThinkProgress

 
 
Fear of Deportation Kept L.A. School’s Parents From Reporting Sex Abuse

By Jorge Rivas | Colorlines

 
 
Awesome Amendment to "Personhood": the "Spilled Semen" Clause

By Jill F | Feministe

 
 
Could Santorum Win the GOP Nomination?

By Steve M | No More Mister Nice Blog

 
 
Obama Anchors Budget on Tax Hikes for the Rich

By Agence France Presse

 
 
NYTimes: The Anti-Government Republican Base is Totally Dependent On Government

By Dartagnan | DailyKos

 
 
 
Reverend Billy Talen
 
 
 
loading ...
POWERED BY DIGG'S USERS
 
[ page served from web 2 ]